Medium Voltage Network: 4300 KM
Low Voltage Network: 6800 KM
Transformation Stations: 7800 UN
Mini-Grids Installed: 79
Installed Capacity: 4,376 MW
Power Produced: 18,352.80 MWh
It is a Program of the Government of Mozambique (with funding from partners) that aims to provide quality, sustainable and affordable energy to all Mozambicans by 2030.
All domestic customers whose residences/installations are less than 100m from the Connection point.
Within the scope of this Program, all new connections are free of charge, the customer does not have to pay anything!
When connecting to the installation, if you do not have a valid identification document, you can present proof issued by the local structure.
Energia para Todos will be implemented nationwide, covering the entire country. However, the process of connecting customers will be gradual, in accordance with the expansion plans for the Electricity Network. Not all clients will be connected at the same time!
Once the mains is completed, the connection process is immediate.
No. Once the mains is completed, the connection process is immediate.
The connection will be made, however the signing of the contract will be in the presence of the owner.
Must be the owner of the residence or a duly authorized representative.
After the connection, the contract signed by EDM and the owner will be delivered to the customer.
All employees will be duly identified with a uniform and badge.
By calling the Customer Hotline at No. 1455. In urgent cases, the customer can go to the nearest EDM Agency.
You must contact the EDM Customer Line at Nº. 1455 or the closest agency.
In addition to the EDM Sales Points, the customer can buy energy through MPesa, E-Mola, ATMs from the Ponto24 Network and Millennium BIM, Internet banking (IZI, BCI Directo, Quick) and authorized resellers: RecargAki and Top Up.